We – EPG Group the most significant gearbox & motors , couplings and gears manufacturing unit in China with 5 distinct branches. For more details: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Technical info list:
Type: | Worm Equipment Pace Reducer |
Product: | NMRV571–one hundred fifty |
Ratio: | one:7.5,10,15,twenty,25,thirty,forty,50,60,eighty,a hundred |
Coloration: | Blue/Silver Or On Client Request |
Materials | Housing: Blue-Coloured Solid-Iron Worm Equipment-Copper-ten-3# Worm-20CrMn Ti with carburizing and quenching, floor harness is fifty six-62HRC Shaft-chromium metal-forty five# |
Lubricant: | Synthetic&Mineral |
Bearing: | C&U Bearing |
Seal: | NAK SKF |
Warranty: | -thirty-40°C |
ICE FLANGE | 80B5,90B5,100B5,112B5,132B5,160B5 |
Rated electrical power: | .06KW,.12KW,.25KW,.75KW,1.5KW,3KW,5.5KW,7.5KW |
Application | Metallurgical machinery, food equipment, stage equipment, welding equipment, road equipment, amusement devices, packaging equipment, Rubber and plastic equipment, environmental defense equipment ,engineering machinery, building machinery, equipment tool business, automotive market, logistics and transportation and so on |
NMRV | PAM | N | M | P | D | |||||||||||
ICE | 5 | seven.five | 10 | fifteen | twenty | 25 | 30 | forty | fifty | 60 | 80 | one hundred | ||||
25 | 56B14 | fifty | sixty five | 80 | 9 | nine | 9 | nine | nine | nine | nine | nine | nine | |||
30 | 63B5 | 95 | a hundred and fifteen | 140 | eleven | 11 | 11 | 11 | 11 | eleven | eleven | eleven | 11 | |||
63B14 | 60 | 75 | 90 | |||||||||||||
56B5 | eighty | one hundred | one hundred twenty | 9 | nine | 9 | 9 | nine | nine | nine | 9 | nine | 9 | 9 | ||
56B14 | fifty | sixty five | 80 | |||||||||||||
40 | 71B5 | a hundred and ten | 130 | a hundred and sixty | 14 | fourteen | fourteen | 14 | 14 | fourteen | fourteen | 14 | ||||
71B14 | 70 | eighty five | a hundred and five | |||||||||||||
63B5 | ninety five | 115 | 140 | 11 | 11 | eleven | 11 | 11 | eleven | eleven | 11 | 11 | eleven | eleven | 11 | |
63B14 | 60 | 75 | ninety | |||||||||||||
56B5 | 80 | one hundred | a hundred and twenty | nine | 9 | nine | 9 | |||||||||
50 | 80B5 | 130 | 165 | two hundred | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | eighty | 100 | 120 | |||||||||||||
71B5 | 110 | 130 | one hundred sixty | 14 | fourteen | fourteen | fourteen | 14 | 14 | fourteen | fourteen | fourteen | fourteen | 14 | ||
71B14 | 70 | 85 | a hundred and five | |||||||||||||
63B5 | 95 | 115 | a hundred and forty | 11 | 11 | eleven | eleven | eleven | ||||||||
63 | 90B5 | one hundred thirty | a hundred sixty five | 200 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | 95 | 115 | 140 | |||||||||||||
80B5 | a hundred thirty | 165 | 200 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | ||||
80B14 | 80 | 100 | a hundred and twenty | |||||||||||||
71B5 | one hundred ten | 130 | 160 | 14 | fourteen | 14 | fourteen | 14 | ||||||||
71B14 | 70 | 85 | 105 | |||||||||||||
75 | 100/112B5 | 180 | 215 | 250 | 28 | 28 | 28 | |||||||||
a hundred/112B14 | one hundred ten | 130 | a hundred and fifty | |||||||||||||
90B5 | a hundred thirty | 165 | two hundred | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | 95 | a hundred and fifteen | a hundred and forty | |||||||||||||
80B5 | 130 | a hundred sixty five | two hundred | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | eighty | 100 | one hundred twenty | |||||||||||||
71B5 | one hundred ten | a hundred thirty | 160 | fourteen | 14 | 14 | 14 | |||||||||
90 | 100/112B5 | one hundred ninety | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
100/112B14 | a hundred and ten | one hundred thirty | one hundred sixty | |||||||||||||
90B5 | a hundred thirty | 165 | 200 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||
90B14 | ninety five | one hundred fifteen | a hundred and forty | |||||||||||||
80B5 | a hundred thirty | one hundred sixty five | 200 | 19 | 19 | 19 | 19 | 19 | ||||||||
80B14 | eighty | 100 | one hundred twenty | |||||||||||||
110 | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | ||||||||
100/112B5 | a hundred and eighty | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||
90B5 | a hundred thirty | 165 | two hundred | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
80B5 | one hundred thirty | one hundred sixty five | two hundred | 19 | 19 | |||||||||||
130 | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | 38 | 38 | 38 | |||||
100/112B5 | 180 | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
90B5 | 130 | a hundred sixty five | 200 | 24 | 24 | |||||||||||
150 | 160B5 | 250 | 300 | 350 | 42 | 42 | 42 | forty two | forty two | |||||||
132B5 | 230 | 265 | 250 | 38 | 38 | 38 | 38 | 38 | 38 | |||||||
one hundred/112B5 | a hundred and eighty | 215 | 200 | 28 | 28 | 28 | 28 |
Factors:
one. Housing: Die-solid Aluminum Alloy Gearbox (RV571~RV090)
Cast Iron Gearbox (RV110~RV150)
2. Worm Wheel: Wearable Tin Bronze Alloy, Aluminum Bronze Alloy
3. Worm Shaft: 20Cr Steel, carburizing, quenching, grinding, surface hardness fifty six-62HRC, .3-.5mm remaining carburized layer right after specific grinding
4. Input Configurations:
Outfitted with Electric powered Motors (AC Motor, Brake Motor, DC Motor, Servo Motor)
IEC-normalized Motor Flange
Sound Shaft Enter
Worm Shaft Tail Extension Enter
five. Output Configurations: Keyed Hollow Shaft Output
Hollow Shaft with Output Flange
Plug-in Solid Shaft Output
6. Spare Elements: Worm Shaft Tail Extension, Solitary Output Shaft, Double Output Shaft, Output Flange, Torque Arm, Dust Protect
7. Gearbox Portray:
Aluminum Alloy Gearbox:
After Shot Blasting, Anticorrosion Treatment and Phosphating, Paint with the Color of RAL 5571 Gentian Blue or RAL 7035 Mild Gray
Cast Iron Gearbox:
After Portray with Red Antirust Paint, Paint with the Colour of RAL 5571 Gentian Blue
Workshop present
FAQ
Qone. What is your terms of packing?
A: Usually, we pack our merchandise in solitary shade box. If you have special ask for about packing, pls negotiate with us in progress, we can pack the merchandise as your request.
Q2. What is your phrases of payment?
A: T/T thirty% as deposit, and 70% prior to supply. We are going to display you the photos of the products and packages
ahead of you pay out the equilibrium. Other payments conditions, pls negotiate with us in progress, we can discuss.
Q3. What is your phrases of shipping and delivery?
A: EXW, FOB, CFR, CIF.
This fall. How about your supply time?
A: Normally, it will get 25 to 30 times after receiving your ept payment. The certain shipping time depends
on the products and the amount of your purchase.
Q5. Can you produce according to the samples?
A: Sure, we can create by your samples or complex drawings. We can create the molds and fixtures.
Q6. What is your sample coverage?
A: We can provide the sample if we have ready elements in stock, but the buyers have to spend the sample price and
the courier expense.We welcome sample order.
Q7. Do you take a look at all your products prior to shipping and delivery?
A: Indeed, we have a hundred% take a look at just before shipping and delivery
Q8: How do you make our company prolonged-time period and great connection?
1. We hold very good high quality and competitive price tag to make certain our consumers benefit
two. We regard each buyer as our friend and we sincerely do business and make friends with them,
no matter exactly where they occur from.
The use of authentic tools manufacturer’s (OEM) portion numbers or trademarks , e.g. CASE® and John Deere® are for reference purposes only and for indicating solution use and compatibility. Our business and the detailed replacement areas contained herein are not sponsored, accredited, or created by the OEM.